Project Insight

Healthcare

Client: Sanctuary Care Ltd
Location: Park View Care Home, Sheffield
Sector: Healthcare
Service: Energy Statements / Air Tightness Testing
Background

A new build care home facility, providing 60 beds, associated communal areas and external landscaping. The two storey building is of traditional construction, with heating and domestic hot water provided through a combination of air source heat pumps and natural gas boilers. 13.34% of the building’s overall energy load is from a renewable source. The site falls under the jurisdiction of Sheffield City Council; in order to comply with the Sheffield Development Framework Core Strategy for the city, the building was required to meet 10% of its energy requirement from renewable or low carbon sources, and incorporate design measures to achieve an overall CO2 saving of 20%.

Project

Stroma delivered a Renewable Energy Statement to demonstrate the building’s ability to satisfy these requirements. Stroma completed energy calculations to demonstrate Part L compliance at both the As-Designed and As-Built stages. The building’s design pre-dated the 2010 Regulations and therefore we undertook the energy assessment under Part L 2006 standards. We also provided air testing services in-house in order to verify the building’s air permeability rating; the Client aimed to exceed the requirements of Part L in order to contribute to the required reduction in CO2.