• Meet regulatory requirements from the initial stages of a development with a design review workshop
  • Stroma is an active member of the Institute for Sustainability in the Thames Gateway area

    More... »
  • Stroma provides compliance testing and consultancy for the UK's top 10 contractors
    [Construction News Top 100, November 2008]
  • Stroma is a UKAS accredited air leakage and acoustic testing body
  • Stroma is developing pioneering new techniques for determining the effectiveness of sustainable, remedial building works

    More... »
  • Stroma has successfully tested more than 5,000 structures, from simple dwellings and single enclosures through to complex public buildings and vast warehouses
  • Stroma delivers CPD on the 2010 Part L regulations for Wates Construction
  • Stroma participated in Shred-it’s recycling program and saved 28 trees from destruction in 2010
  • Use the equipment calculator – the quick and easy way to determine your requirements
  • Stroma has calibrated over 350 different fans and manometers
  • Stroma has been a door fan distributor for over 4 years
  • What is the RRO?
  • What type of building needs a fire risk assessment?
  • Stroma launches fire risk assessor training course
  • Fire risk assessments for all non-domestic buildings
  • Third party accredited Stroma Contracting specialises in the remedial fire protection and fire stopping works needed for RRO compliance
  • PART L The Impact on Air Tightness... Rob Coxon outlines the targets in air-tightness testing in new homes.
  • Put money saving at the top of your agenda... Reduce your energy bills and your carbon footprint
  • Airtight buildings.... Waste less energy and cause less CO2
  • Buildings don’t need to “breathe”, only people do! Therefore… “Build Tight – Ventilate Right”
  • The New Part L1A & L2A 2010 Air-Tightness Requirements
  • Fundamental Approaches Designing for Air-Tightness Under Part L, establish what the air-tightness target has to be....
  • All air-conditioning systems with an effective rated output of more than 12kW must be regularly inspected by an energy assessor every 5 years, since the 4th January 2011.
  • Stroma Head Office, Pioneer Way,
    Castleford, West Yorkshire, WF10 5QU
    Telephone: 0845 621 11 11  
    Email: info@stroma.com
    © Stroma 2010  - Sitemap

    Stroma Members
    Stroma Solar