Commercial Air Tightness Testing Kits

A Retrotec test kit is a flexible and cost-effective solution for carrying out air leakage tests on commercial buildings. Use our equipment calculator to determine the type and number of fans you need.

Use the equipment calculator – the quick and easy way to determine your requirements.

Fan
System
Air Permeability
(m³/h.m² @ 50Pa)
Building
Envelope (m²)
No. of Fans

The Q4E and QMG make air tightness testing quick, simple and effective. The models, available for 110v and 240v electrical supply, are easy to transport and assemble due to their compact and lightweight design. The various accessories available make these fan systems suitable for a range of testing situations and both can be left running continuously, ideal for smoke pencil leakage diagnosis.

Download our product specifications for further details of our range:

 

View our brochure

Kit Q4E

Consists of a DM-2A, a 3300 fan and a cloth door panel.

 

View our brochure

Kit QMG

Consists of a DM2a, a DM2, three 3300 fans, cases and covers, a Door Fan 3 software license and a hard panel door for three fans.

  • Meet regulatory requirements from the initial stages of a development with a design review workshop
  • Stroma is an active member of the Institute for Sustainability in the Thames Gateway area

    More... »
  • Stroma provides compliance testing and consultancy for the UK's top 10 contractors
    [Construction News Top 100, November 2008]
  • Stroma is a UKAS accredited air leakage and acoustic testing body
  • Stroma is developing pioneering new techniques for determining the effectiveness of sustainable, remedial building works

    More... »
  • Stroma has successfully tested more than 5,000 structures, from simple dwellings and single enclosures through to complex public buildings and vast warehouses
  • Stroma delivers CPD on the 2010 Part L regulations for Wates Construction
  • Stroma participated in Shred-it’s recycling program and saved 28 trees from destruction in 2010
  • Use the equipment calculator – the quick and easy way to determine your requirements
  • Stroma has calibrated over 350 different fans and manometers
  • Stroma has been a door fan distributor for over 4 years
  • What is the RRO?
  • What type of building needs a fire risk assessment?
  • Stroma launches fire risk assessor training course
  • Fire risk assessments for all non-domestic buildings
  • Third party accredited Stroma Contracting specialises in the remedial fire protection and fire stopping works needed for RRO compliance
  • PART L The Impact on Air Tightness... Rob Coxon outlines the targets in air-tightness testing in new homes.
  • Put money saving at the top of your agenda... Reduce your energy bills and your carbon footprint
  • Airtight buildings.... Waste less energy and cause less CO2
  • Buildings don’t need to “breathe”, only people do! Therefore… “Build Tight – Ventilate Right”
  • The New Part L1A & L2A 2010 Air-Tightness Requirements
  • Fundamental Approaches Designing for Air-Tightness Under Part L, establish what the air-tightness target has to be....
  • All air-conditioning systems with an effective rated output of more than 12kW must be regularly inspected by an energy assessor every 5 years, since the 4th January 2011.
  • Stroma Head Office, Pioneer Way,
    Castleford, West Yorkshire, WF10 5QU
    Telephone: 0845 621 11 11  
    Email: info@stroma.com
    © Stroma 2010  - Sitemap

    Stroma Members
    Stroma Solar