Air-Conditioning Inspections

Air-conditioning systems account for a significant proportion of a building’s energy usage. It is therefore vital to ensure that such systems are regularly inspected to ensure that they are operating efficiently.

Article 9 of the Energy Performance of Buildings Directive (EPBD) requires that all air-conditioning systems with an effective rated output of more than 12kW must be regularly inspected by an energy assessor every 5 years, since the 4th January 2011. Fines may apply if this obligation is not met. Stroma's certified inspectors are qualified to conduct air-conditioning inspections for all types of system.

We use the CIBSE TM44 reporting methodology which is in accordance with the requirements of BS EN 15240. We carry out an extensive survey of the air conditioning system(s) on-site and produce an advisory report, which is both issued to the building owners and lodged on the Non-Domestic Energy Performance Certificate Register.

Advisory reports contain:

  • Detailed inspection notes and an assessment of the overall performance of the air-conditioning system.
  • Calculations to assess whether the system is adequately sized or oversized for purpose.
  • Recommendations for building owners which, if implemented, improve the efficiency and reduce the energy consumption (and CO2 emissions) of the system, resulting in reduced operating costs.
  • Alternative solutions to strategy, maintenance regimes and air-conditioning technologies.

Stroma's ACI team has worked with a diverse range of clients, from national and regional property consultants, major car manufacturers and corporate recovery specialists to auctioneers, retailers and major developers and contractors.

Stroma can help you to meet your legal obligations and reduce your building running costs, with a responsive, UK-wide service. To discuss your requirements or to request a quotation, please call us on 0845 621 22 22 or email This e-mail address is being protected from spambots. You need JavaScript enabled to view it .

  • Meet regulatory requirements from the initial stages of a development with a design review workshop
  • Stroma is an active member of the Institute for Sustainability in the Thames Gateway area

    More... »
  • Stroma provides compliance testing and consultancy for the UK's top 10 contractors
    [Construction News Top 100, November 2008]
  • Stroma is a UKAS accredited air leakage and acoustic testing body
  • Stroma is developing pioneering new techniques for determining the effectiveness of sustainable, remedial building works

    More... »
  • Stroma has successfully tested more than 5,000 structures, from simple dwellings and single enclosures through to complex public buildings and vast warehouses
  • Stroma delivers CPD on the 2010 Part L regulations for Wates Construction
  • Stroma participated in Shred-it’s recycling program and saved 28 trees from destruction in 2010
  • Use the equipment calculator – the quick and easy way to determine your requirements
  • Stroma has calibrated over 350 different fans and manometers
  • Stroma has been a door fan distributor for over 4 years
  • What is the RRO?
  • What type of building needs a fire risk assessment?
  • Stroma launches fire risk assessor training course
  • Fire risk assessments for all non-domestic buildings
  • Third party accredited Stroma Contracting specialises in the remedial fire protection and fire stopping works needed for RRO compliance
  • PART L The Impact on Air Tightness... Rob Coxon outlines the targets in air-tightness testing in new homes.
  • Put money saving at the top of your agenda... Reduce your energy bills and your carbon footprint
  • Airtight buildings.... Waste less energy and cause less CO2
  • Buildings don’t need to “breathe”, only people do! Therefore… “Build Tight – Ventilate Right”
  • The New Part L1A & L2A 2010 Air-Tightness Requirements
  • Fundamental Approaches Designing for Air-Tightness Under Part L, establish what the air-tightness target has to be....
  • All air-conditioning systems with an effective rated output of more than 12kW must be regularly inspected by an energy assessor every 5 years, since the 4th January 2011.
  • Stroma Head Office, Pioneer Way,
    Castleford, West Yorkshire, WF10 5QU
    Telephone: 0845 621 11 11  
    Email: info@stroma.com
    © Stroma 2010  - Sitemap

    Stroma Members
    Stroma Solar